Back to Blog

VP of Engineering Build vs Buy Decisions at Series A Companies: Stage-Smart Leadership Clarity

Building at Series A locks up 2-3 years of technical leadership bandwidth and creates hiring needs that might not fit your current funding reality.

Posted by

TL;DR

  • Series A VPs of Engineering deal with build vs buy calls in 5-15 person teams where every hire and tool choice hits runway and product speed hard.
  • The decision framework means weighing cost to build, cost to maintain, cost to buy, expertise depth, and business criticality - all against a 12-18 month runway.
  • Teams with specialized needs (fraud detection, real-time payments, ML infra) usually need 50+ engineers to build well, so buying is often smarter at Series A.
  • Even bought solutions can eat 15-30% of engineering bandwidth for integration and maintenance.
  • Building at Series A locks up 2-3 years of technical leadership bandwidth and creates hiring needs that might not fit your current funding reality.

A VP of Engineering leading a team discussion around a digital whiteboard with flowcharts and graphs in a modern office.

Core Dimensions of Build vs Buy Decisions for Series A Engineering Leaders

Aligning Build vs Buy With Business Strategy and Product-Market Fit

Decision Priority Matrix by Business Stage

Business ContextBuild SignalBuy Signal
Pre-product-market fitFeature directly validates core hypothesisStandard capability blocking customer pilots
Early traction (0-10 customers)Capability creates measurable differentiationIntegration takes <2 weeks, proven reliability
Scaling product-market fitTechnology becomes competitive moatVendor expertise exceeds team capacity

Critical Alignment Questions

  • Does this capability directly impact what customers pay for?

  • Will building this slow down or speed up the next customer milestone?

  • Does the internal build timeline fit the next funding milestone?

  • Early-stage companies favor speed, often buying to save engineering focus for differentiators.

Assessing Core Competencies and Strategic Differentiators

Core vs. Context Framework

Capability TypeDefinitionDefault Action
Core competencyTech that creates market-specific advantageBuild in-house
Strategic differentiatorFeature customers pick you forBuild unless vendor offers deep customization
Table stakesExpected, but not a selection driverBuy when quality vendors exist
Undifferentiated heavy liftingComplex infra with no business logicBuy unless cost is prohibitive

Differentiator Assessment Criteria

  • Will customers pay just for this?

  • Do competitors struggle here?

  • Does it need proprietary data or deep domain expertise?

  • Does value increase as the product grows?

  • Series A leaders must consider team skill and timing. Sometimes, building is justified if it’s truly core - even if vendors exist.

Operational Impact: Resource Allocation and Opportunity Cost

True Cost Comparison Model

Cost CategoryBuild CalculationBuy Calculation
Initial deliveryEng weeks × cost + design/product timeVendor annual cost ÷ 12 + integration effort
Ongoing maintenance20-30% of build time per yearSupport tier cost + upgrade cycles
Opportunity costFeatures not built × potential revenue impactEng time goes to core features
Technical debtRefactoring + docs overheadVendor lock-in risk + migration cost

Resource Allocation Reality Check

  • Team size: 8-15 engineers, 60-70% on product work

  • Build: Custom infra eats 2-4 engineers full-time after launch

  • Integration: Vendor solutions take 1-4 weeks (API complexity varies)

  • Switching: Replacing a bought tool takes 2-3× the original integration time

  • Over 60% of IT leaders regret at least one major build or buy within three years (Gartner 2022).

  • Main Series A failure: building infra that delays product-market fit by 6+ months.

Opportunity Cost Calculation

ScenarioBuild WeeksBuy WeeksOpportunity Cost (Build - Buy)
Payments integration826 engineering weeks

Modern Evaluation Criteria and Execution Models at Series A Scale

Get Codeinated

Wake Up Your Tech Knowledge

Join 40,000 others and get Codeinated in 5 minutes. The free weekly email that wakes up your tech knowledge. Five minutes. Every week. No drowsiness. Five minutes. No drowsiness.

Technical Considerations: Stack Fit, Integration, and Scalability

Stack Compatibility Assessment

CriteriaBuildBuy (SaaS)Buy (Off-the-Shelf)
Integration ComplexityFull controlAPIs, webhooks, connectorsCustom middleware, less flexibility
Microservices FitNative alignmentVaries; modern SaaS adapts wellOften monolithic, bottlenecks
Stack ConstraintsNoneMay require specific techPlatform dependencies
Scalability CeilingTeam-limitedVendor-managed, scales by tierFixed; may need re-platforming

Integration Cost Drivers

  • Auth/auth sync across systems
  • Data transformation layers between microservices and APIs
  • Real-time vs. batch processing
  • Webhook reliability and retries
RuleExample
Use SaaS for compliance-heavy infraPayment processing, fraud detection at Series A
Build when feature is core IPCustom search for dev tools company
Use low-code for internal toolsAdmin dashboards, not customer-facing features

Cost Analysis, Total Cost of Ownership, and Vendor Risks

Total Cost of Ownership Comparison (18-Month Horizon)

Cost ComponentCustom DevelopmentSaaS SolutionHybrid Approach
Development$180k-$360k$0$90k-$150k
Licensing$0$12k-$60k/year$12k-$36k/year
Maintenance$60k-$120k/yearIncluded$30k-$60k/year
Integration$0$20k-$40k$30k-$50k
Total (18 months)$240k-$480k$30k-$100k$150k-$260k

Vendor Selection Criteria

  • Vendor stability: revenue, funding, customer count
  • Support: SLAs, dedicated manager
  • Lock-in risk: data export, API ownership, migration paths
  • Feature velocity: release cadence, roadmap access

Hidden Cost Factors

  • Engineering time on non-core features
  • Customer support for custom builds
  • Security/compliance audits
  • Performance monitoring/optimization
RuleExample
Avoid enterprise platforms at Series ASAP rarely fits Series A due to complexity
Use low-code for non-critical internal toolsCustom admin panels, not main product

Time-to-Market, User Experience, and Future Enhancements

Implementation Timeline Comparison

MilestoneCustom BuildSaaS IntegrationOff-the-Shelf + Customization
MVP Launch12-16 weeks2-4 weeks6-10 weeks
Production-Ready20-28 weeks4-6 weeks12-18 weeks
Feature Parity32-48 weeksImmediate20-32 weeks
User Growth ScalingGradualImmediatePlatform-limited

User Experience Trade-offs

  • Custom: tailored workflows, needs UX resources
  • SaaS: proven UX, less flexible
  • Hybrid: fast, but can feel inconsistent
Get Codeinated

Wake Up Your Tech Knowledge

Join 40,000 others and get Codeinated in 5 minutes. The free weekly email that wakes up your tech knowledge. Five minutes. Every week. No drowsiness. Five minutes. No drowsiness.

Future Scalability Decision Matrix

ScenarioRecommended PathReasoning
Core differentiatorCustom developmentNeed control, competitive edge
Commodity featureSaaS solutionFaster, proven, less risk
Regulated functionalitySpecialized SaaSVendor handles certification
Internal toolingLow-code platformCheap, quick, not mission-critical

Execution Model Selection Criteria

  • Team size vs. feature scope

  • Months of runway left

  • Market pressure and timing

  • Technical debt tolerance

  • Series A companies should buy for payments, fraud, and compliance-heavy features. Build for true product differentiation and IP.

Frequently Asked Questions

  • What’s the average Series A engineering team size? → 8-15 engineers
  • How much time does integration of a SaaS tool typically take? → 1-4 weeks, depending on complexity
  • When should you build instead of buy? → When the feature is a core differentiator or creates unique IP
  • What’s a common pitfall at Series A? → Building infrastructure that delays product-market fit validation

How should a VP of Engineering approach build vs buy decisions for technology at a Series A startup?

Decision sequence:

  1. Clarify the business goal (like revenue, retention, or cutting costs)
  2. Set a decision deadline (usually 1–2 weeks is enough at Series A)
  3. Compare costs for both options, focusing on monthly burn impact
  4. Check team capacity in engineering hours per sprint
  5. Evaluate if market solutions are mature and vendors are stable
  6. Decide and write down why

Series A-specific constraints:

  • Engineering teams are usually 5–15 people
  • Runway is often 18–24 months
  • Getting to market fast beats perfect customization
  • Higher tolerance for technical debt than later stages

Rule → Example:
Default to buying unless the feature is core to the product’s competitive edge. At Series A, saving engineering resources for the main product is more important than owning every system.


What are the key factors a VP of Engineering must consider when deciding between building in-house or purchasing off-the-shelf solutions?

Critical evaluation dimensions:

FactorBuild SignalBuy Signal
Competitive differentiationCore product featureCommon infrastructure need
Time to productionCan ship in 2–4 weeksWould take 3+ months
Team expertiseTeam has deep domain knowledgeNeeds specialized skills
Total cost (12 months)Lower than vendor pricingHigher than vendor + integration
Maintenance burdenFits existing systemsAdds new operational overhead
Vendor maturityNo stable options existMultiple proven vendors

Cost calculation requirements:

  • Engineering salary per hour
  • Opportunity cost (engineers not on core product)
  • Infrastructure/tooling expenses
  • Ongoing maintenance (at least 20% of build time yearly)
  • Integration and management overhead for bought tools

Rule → Example:
Always use a structured build vs buy framework to weigh these factors.


What role does a VP of Engineering play in the cost-benefit analysis of build vs buy scenarios at early-stage companies?

Primary responsibilities:

  • Convert engineering effort into dollar costs (loaded rates)
  • Calculate total cost of ownership over 12–24 months
  • Present clear financial options to CEO/board
  • Quantify what engineering time could build instead
  • Surface hidden costs in both paths

Cost framework VPs must own:

Cost TypeBuild CalculationBuy Calculation
InitialEngineer weeks × loaded rate + infraLicense fees + integration
Maintenance20–30% of build cost each yearAnnual subscription + management
OpportunityLost feature developmentVendor dependency risk
RiskTechnical debt + system ownershipVendor viability + lock-in

Rule → Example:
Present these numbers alongside technical risks so execs can see the trade-offs against runway and growth targets.


How does the stage of a company influence the build vs buy decision-making process from a VP of Engineering's perspective?

Stage-based decision bias:

Company StageDefault StancePrimary Driver
Pre-seed to SeedStrong buy biasMaximize speed to market
Series ABuy for non-core, build for coreBalance speed and moat
Series B+Selective build for strategyControl/customization
Growth/LateBuild for core infrastructureScale economics/ownership

Series A-specific factors:

  • Team can handle only 2–3 big projects at once
  • Product-market fit is more important than perfect tech
  • Investors are watching user growth and revenue
  • Engineering is 30–40% of operating expenses

Rule → Example:
Company stage changes the build vs buy equation: Series A startups must prove scalability with limited resources.


How does a VP of Engineering align build vs buy decisions with a Series A company's short-term and long-term goals?

Goal alignment matrix:

Business GoalBuild ApproachBuy Approach
Reach next funding milestone (12–18mo)Only for product differentiatorsDefault for everything else
Prove unit economicsBuild if vendor costs break modelBuy if it's a faster path to revenue
Scale to 10x usersBuy scalable infrastructureBuild only if bought can't scale
Establish competitive moatBuild unique capabilitiesBuy commodity functions

Decision criteria by timeline:

  • Short-term (0–6 months):

    • Speed to deploy
    • Impact on current roadmap
    • Team bandwidth this quarter
  • Long-term (12–24 months):

    • Switching costs if in-house fails
    • Vendor lock-in risk if buying
    • Maintenance burden growth

Rule → Example:
Map each decision to the next milestone - usually, that’s hitting Series B metrics at Series A.

Get Codeinated

Wake Up Your Tech Knowledge

Join 40,000 others and get Codeinated in 5 minutes. The free weekly email that wakes up your tech knowledge. Five minutes. Every week. No drowsiness. Five minutes. No drowsiness.